Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Light gray warehouse roof beside process plants, seen from above

Drone view of a World Steel warehouse on an overseas industrial site.

Tay Ninh Province, Vietnam

Cuong Dai Packaging Factory Structural steel for a factory in Vietnam

A factory building in Tay Ninh Province, Vietnam, listed in World Steel's portfolio for 2018. Packaging plants combine production halls and finished-goods storage, as many US converting plants do.

Location
Tay Ninh Province, Vietnam
Building type
Factory
Year
2018
Next step Plan a similar building →

Project overview

About Cuong Dai Packaging Factory

Cuong Dai Packaging Factory in Tay Ninh Province was completed in 2018 with structural steel engineered and fabricated by World Steel. Packaging plants generally need long production lines, raw-material storage and outbound staging under one roof.

Corrugated box, film and container manufacturers in the US face the same layout pressures. Column spacing that suits your line lengths and forklift aisles is a general design point to settle early with your Engineer of Record. We then detail the frame in Tekla, coordinate through BIM/IFC models and ship it in erection order. Share your floor plan to get started.

Packaging plants run printing and converting lines next to large storage areas for paper and finished cartons. The storage areas are fire-sensitive, so sprinkler and rack layouts are agreed before the frame is set.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Cuong Dai Packaging Factory by the numbers

In the portfolio

Cuong Dai Packaging Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Cuong Dai Packaging Factory in 2018, together with 5 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.