- Location
- Philippines
- Building type
- Warehouse
- Year
- 2023
- Structural steel
- 220 t
Project overview
About Vic Ong Warehouse
Vic Ong Warehouse in the Philippines was completed in 2023 with about 220 metric tons of World Steel structural steel. That is a mid-size warehouse order, the scale of a regional distributor or a large agricultural storage building.
For a US owner, a tonnage figure is a useful benchmark when comparing bids, since steel weight drives both material and freight. We report tonnage by building area in every proposal and show where value-engineering options could trim it, subject to your Engineer of Record’s approval. Steel ships in containers sorted by erection order. Send your dimensions for a priced estimate.
About 220 tonnes is a mid-size package that fills several containers or a breakbulk lot. Typhoon winds in the Philippines put much of the design effort into the roof and wall bracing, as hurricanes do on the US Gulf Coast.
Gallery
Vic Ong Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Vic Ong Warehouse by the numbers
Steel weight
About 220 metric tons of structural steel (243 short tons), about 9% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 12th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Vic Ong Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 8 projects listed for Philippines.
World Steel supplied Vic Ong Warehouse in 2023, together with 21 other projects shown here from that year.
Closest in steel weight:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Philippines · 2024
Honda Warehouse
Warehouse
Photo
Philippines · 2020
Coca Cola Warehouse
Warehouse
Photo
Philippines · 2024
Proposed Simon Warehouse Complex
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.