Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the Warehouse 25×80, Thailand

Aerial photo, World Steel project archive.

Thailand

Warehouse 25×80 Structural steel for a warehouse in Thailand

World Steel's steel warehouse in Thailand. The project name gives its plan size as 25 × 80. No completion year is published for it. It is an example of the plain, repeatable warehouse format that is simplest to fabricate and ship.

Location
Thailand
Building type
Warehouse
Footprint
25 m × 80 m (82 ft × 262 ft) · about 2,000 m² (21,500 sq ft)
Next step Plan a similar building →

Project overview

About Warehouse 25×80

Warehouse 25×80 in Thailand measures 25 by 80 m, about 82 by 262 ft and roughly 21,500 sq ft. Its long, relatively narrow shape is a good fit for US operations that load and unload along one sidewall, such as building suppliers, beverage and food distributors, or contractors staging materials for multiple jobs.

When doors are spaced along a long wall, girts, jambs and wall bracing must be arranged so the openings do not interrupt the lateral system. World Steel coordinates those details in Tekla Structures and shows every framed opening on the erection drawings. Send your door schedule and building size to receive a scope for a comparable US warehouse.

At 25 m by 80 m, about 2,000 m² (21,500 sq ft), the building is long relative to its width, and the end walls and wall bracing work hard against wind along the length. This is a common shape for US manufacturing and storage buildings on long, narrow lots.

In context

Warehouse 25×80 by the numbers

Footprint

About 2,000 m² (21,530 sq ft) of footprint, about 37% of a US football field with end zones.

It is 25 m (82 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.

By footprint it ranks 16th of the 26 warehouses on this site with published dimensions.

In the portfolio

Warehouse 25×80 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.