Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Coca Cola Warehouse, Philippines in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Philippines

Coca Cola Warehouse Structural steel for a warehouse in Philippines

A steel warehouse in the Philippines, listed in World Steel's portfolio for 2020. Built for a global beverage brand, it shows the documentation and quality checks large owners expect, as many US owners do.

Location
Philippines
Building type
Warehouse
Year
2020
Next step Plan a similar building →

Project overview

About Coca Cola Warehouse

Coca Cola Warehouse is a 2020 World Steel project in the Philippines, a steel storage building for beverage products. Beverage distribution warehouses handle heavy pallet loads, frequent truck movements and large door openings.

US beverage and food distributors build around those same needs. Dock door count, forklift clearance and any racking tied to the structure are general design points to set at the start with your Engineer of Record. We then design the frame to IBC 2024 and ASCE 7-22 and ship it ready for your erector. Send your operating requirements for a framing study.

Beverage distribution warehouses move pallets quickly, with many dock doors and wide floors for forklifts. A US bottler or distributor would ask the same things of the frame: wide bays, high clear height and a door layout that does not fight the bracing.

In context

Coca Cola Warehouse by the numbers

In the portfolio

Coca Cola Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 8 projects listed for Philippines.

World Steel supplied Coca Cola Warehouse in 2020, together with 26 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.