- Location
- Thailand
- Building type
- Warehouse
- Year
- 2022
- Footprint
- 80 m × 120 m (262 ft × 394 ft) · about 9,600 m² (103,300 sq ft)
Project overview
About CPE Warehouse 80×120
CPE Warehouse 80×120 is a 2022 project in Thailand with a listed footprint of 80 by 120 m, about 262 by 394 ft and more than 100,000 sq ft. At a width over 260 ft, a building is normally framed with interior column lines, a layout US owners will recognize from large distribution centers and manufacturing plants.
World Steel can work with your Engineer of Record on column grid, roof drainage and expansion joints for a building at this scale, then fabricate the steel in its IAS AC472-accredited factory and ship it in erection order. Federal or publicly funded projects should confirm domestic steel requirements with the contracting officer first. Send your plans to discuss a large-format package.
If the name gives the plan in meters, this building covers about 9,600 m² (103,000 sq ft), well within US distribution-center size. Floors this large usually have interior column lines, set where they do not block racking aisles or truck movement.
Gallery
CPE Warehouse 80×120 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
CPE Warehouse 80×120 by the numbers
Footprint
About 9,600 m² (103,330 sq ft) of footprint, roughly 1.8 times a US football field with end zones.
It is 80 m (262 ft) wide. A width over 55 m is normally framed as a multi-span building, with interior column lines set where the racking or process layout allows.
By footprint it ranks 2nd of the 26 warehouses on this site with published dimensions.
In the portfolio
CPE Warehouse 80×120 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied CPE Warehouse 80×120 in 2022, together with 12 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand
Warehouse 25×42
Warehouse
Photo
Thailand · 2024
M&D Warehouse
Warehouse · 2,000 t steel
Photo
Thailand · 2025
Warehouse 38×135
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.