- Location
- Thailand
- Building type
- Warehouse
- Year
- 2025
- Footprint
- 38 m × 135 m (125 ft × 443 ft) · about 5,130 m² (55,200 sq ft)
Project overview
About Warehouse 38×135
Warehouse 38×135, supplied to a site in Thailand in 2025, has a footprint of 38 by 135 m, close to 125 by 443 ft and about 55,000 sq ft. Buildings of this size are a staple of US light industrial parks, where owners want a long run of dock doors along one side and enough clear area to keep forklifts moving freely.
For a comparable US warehouse, World Steel designs primary frames to AISC 360, cold-formed purlins and girts to AISI S100 and loads to ASCE 7-22 for your location. The steel comes from an IAS AC472-accredited factory, and many jurisdictions recognize that accreditation for special inspection purposes, though your building official decides. Request a quote with your dimensions.
A footprint of about 5,100 m² (55,200 sq ft) sits close to the size of a US football field with end zones. Buildings this size usually have dock doors on at least one long side, and the door layout fixes where the wall bracing can go.
Gallery
Warehouse 38×135 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 38×135 by the numbers
Footprint
About 5,130 m² (55,220 sq ft) of footprint, close to the area of a US football field with end zones.
It is 38 m (125 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.
By footprint it ranks 11th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 38×135 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 38×135 in 2025, together with 6 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand
Warehouse 26×49
Warehouse
Photo
Thailand · 2024
M&D Warehouse
Warehouse · 2,000 t steel
Photo
Thailand
Warehouse 20×36
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.