- Location
- Thailand
- Building type
- Warehouse
- Year
- 2023
Project overview
About SMC3 Warehouse
SMC3 Warehouse is a 2023 project in Thailand with a pre-engineered steel frame by World Steel. Like most of the company’s Thai warehouse work, it represents the everyday core of the business: a practical storage building, engineered to its loads and fabricated in a controlled factory instead of being cut and welded piece by piece on site.
For US owners, the benefit of shop fabrication is predictability in the field: members arrive cut, drilled and marked, and the crew bolts them together following the erection drawings. World Steel’s factory holds IAS AC472 accreditation for metal building systems, and your building official decides how it applies to inspections. Send your warehouse details for a quote.
The name suggests a third building for the same program. When an owner builds in series, the first design becomes a template, and each later building only changes for site loads and size.
Gallery
SMC3 Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
SMC3 Warehouse by the numbers
In the portfolio
SMC3 Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied SMC3 Warehouse in 2023, together with 21 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2024
Warehouse 36×114
Warehouse
Photo
Thailand · 2025
Warehouse 38×135
Warehouse
Photo
Thailand · 2023
Warehouse 16×50
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.