- Location
- Ho Chi Minh City, Vietnam
- Building type
- Multi-storey & civil building
- Year
- 2020
Project overview
About Southgate Tower
Southgate Tower in Ho Chi Minh City, Vietnam, is a 2020 multi-story project for which World Steel provided steel structure design, fabrication and supply. Tower work in general demands tight dimensional control: columns stack over many levels, small fabrication errors add up with height, and connections have to stay consistent across a large number of similar pieces.
US developers and general contractors planning a mid-rise can use the project as evidence of experience beyond single-story buildings. Our multi-story frames are checked to AISC 360 in a SAP2000 analysis model and detailed in Tekla Structures, with the scope agreed with your Engineer of Record, who stays responsible for the overall design. Send your structural set for a review.
In a dense city center, steel arrives in small, scheduled deliveries because there is no room to store it on site. That makes accurate erection sequencing essential, and it is the same constraint a US contractor faces on an urban infill lot: World Steel packs members in the order they will be lifted.
Gallery
Southgate Tower images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Southgate Tower by the numbers
In the portfolio
Southgate Tower is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Southgate Tower in 2020, together with 26 other projects shown here from that year.
More multi-storey and civil buildings:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Ho Chi Minh City, Vietnam · 2020
The Sun Tower
Multi-storey & civil building
Photo
Ho Chi Minh City, Vietnam · 2020
Dat Tuan Pharmaceutical Office
Multi-storey & civil building
Photo
Tay Ninh Province, Vietnam · 2023
World Steel Group Office, Tay Ninh
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.