- Location
- Myanmar
- Building type
- Steel building
- Year
- 2019
Project overview
About Kanata
Kanata is a 2019 steel building project in Myanmar with structural steel supplied by World Steel. It sits alongside Tamada Warehouse as one of the company’s export deliveries to that country the same year.
For a US buyer, the value of a reference like this lies in the process rather than the location: engineering in SAP2000, detailing in Tekla, fabrication in an IAS AC472-accredited shop and a sequenced shipment. On a US building, your Engineer of Record sets the design basis and your local building department issues the permit. Send your project details to start.
Kanata is a building supplied to Myanmar in 2019. Steel sent there crossed borders and ports, with the paperwork and packing that export requires, the same skills US shipments need.
Gallery
Kanata images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Kanata by the numbers
In the portfolio
Kanata is one of 3 steel buildings in the World Steel portfolio on this site, and one of 2 projects listed for Myanmar.
World Steel supplied Kanata in 2019, together with 19 other projects shown here from that year.
More steel buildings:
Design points
What a steel building needs from its steel
General points for every steel building, not specific to this one.
A single designed system
Rigid frames, purlins, girts and panels are designed as one metal building system, so parts fit together when the crew opens the containers.
Learn more →Built for the next bay
An expandable end wall lets the owner add bays later without rebuilding the original building.
Learn more →Uplift drives the details
Across much of the US, roof uplift from ASCE 7 wind sets purlin size, fastener spacing and anchor rods.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Steel building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Picton East, Western Australia, Australia · 2022
Syncro Engineering
Steel building
Photo
Thailand · 2020
Hat Yai Project
Steel building
Photo
Vietnam · 2022
Hai Trung Furniture Showroom and Model House Center
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a steel building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.