- Location
- Japan
- Building type
- Warehouse
- Year
- 2025
Project overview
About Montaki Warehouse
Montaki Warehouse is a 2025 project in Japan, where World Steel supplied the structural steel for a storage building. Japan is a market with demanding expectations for dimensional accuracy and documentation.
For a US buyer, an export to Japan shows a factory that can meet a foreign owner’s standards and paperwork, which is the same task as meeting a US building department’s requirements. On your project we work to IBC 2024, ASCE 7-22 and AISC 360 unless your Engineer of Record sets otherwise, from an IAS AC472-accredited plant. Ask for a quote on your warehouse.
Japan has some of the world's strictest seismic and snow load rules, so a warehouse there is a strong test of detailing and fabrication quality. For US buyers in seismic regions, this is a useful check on World Steel's ability to work to demanding standards.
Gallery
Montaki Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Montaki Warehouse by the numbers
In the portfolio
Montaki Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 1 projects listed for Japan.
World Steel supplied Montaki Warehouse in 2025, together with 6 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2023
JSB Warehouse 55×127
Warehouse
Photo
Thailand · 2020
AMW Warehouse
Warehouse
Photo
Thailand · 2026
Warehouse 30×100
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.