Mongkolphisan Warehouse 80×70 Structural steel for a warehouse in Thailand

World Steel's 2022 steel warehouse in Thailand. The project name gives its plan size as 80 × 70. A near-square plan, which spreads loads differently from a long shed and suits US warehouses on wide, shallow lots.

Location
Thailand
Building type
Warehouse
Year
2022
Footprint
80 m × 70 m (262 ft × 230 ft) · about 5,600 m² (60,300 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About Mongkolphisan Warehouse 80×70

Mongkolphisan Warehouse in Thailand was supplied in 2022 with a listed footprint of 80 by 70 m, roughly 262 by 230 ft and about 60,000 sq ft. A near-square plan like this is common in US agricultural processing, cold storage and manufacturing, where a deep floor keeps material flow compact rather than spread down a long corridor.

Square buildings bring their own design points, often including several spans side by side, multi-ridge roof drainage, and interior columns placed to avoid process lines. World Steel can study these with your team in SAP2000 and Tekla Structures before fabrication. Share your process layout and site location to start planning a comparable US building.

A near-square plan spreads the roof over two directions, and with spans this wide the building normally has interior columns. US warehouses on wide, shallow lots face the same layout question.

In context

Mongkolphisan Warehouse 80×70 by the numbers

Footprint

About 5,600 m² (60,280 sq ft) of footprint, close to the area of a US football field with end zones.

It is 70 m (230 ft) wide. A width over 55 m is normally framed as a multi-span building, with interior column lines set where the racking or process layout allows.

By footprint it ranks 8th of the 26 warehouses on this site with published dimensions.

In the portfolio

Mongkolphisan Warehouse 80×70 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Mongkolphisan Warehouse 80×70 in 2022, together with 12 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.