- Location
- Thailand
- Building type
- Warehouse
- Year
- 2024
- Footprint
- 36 m × 114 m (118 ft × 374 ft) · about 4,104 m² (44,200 sq ft)
Project overview
About Warehouse 36×114
Warehouse 36×114 is a 2024 Thai project measuring 36 by 114 m, about 118 by 374 ft and around 44,000 sq ft. A width close to 120 ft is popular with US logistics tenants because it offers a deep floor for racking and truck staging while staying within the range a single-span frame can often cover economically.
World Steel delivers buildings like this as complete steel packages: primary frames, secondary members, bracing, anchor bolts and the drawings needed to erect them. Steel ships in containers or as breakbulk, sorted so the first frames off the truck are the first to go up. If you are planning a US warehouse in this size range, send the basics for a quote.
At about 4,100 m² (44,200 sq ft), this is a mid-size warehouse by US standards. For racking, the bay spacing should match the rack layout, which is why World Steel asks for the racking plan before finalizing the frame grid.
Gallery
Warehouse 36×114 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 36×114 by the numbers
Footprint
About 4,104 m² (44,180 sq ft) of footprint, about 77% of a US football field with end zones.
It is 36 m (118 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.
By footprint it ranks 12th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 36×114 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 36×114 in 2024, together with 16 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2023
JSB Warehouse 28×76
Warehouse
Photo
Thailand · 2024
M&D Warehouse
Warehouse · 2,000 t steel
Photo
Thailand · 2026
Warehouse 30×100
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.