Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Painted welded plate girder with a drilled end plate for the Guyana Mosque

Guyana Mosque. Shop photo: a finished plate girder, end plate drilled for bolting.

Georgetown, Guyana

Guyana Mosque Structural steel for a place of worship in Guyana

A two-floor mosque in Georgetown, Guyana, on an 18 m × 21 m (59 ft × 69 ft) plan with a semi-circular platform at the front. World Steel designed the steel structure and sheeting and fabricated welded plate girders up to 1.5 m (4.9 ft) deep in its plant in Vietnam.

Location
Georgetown, Guyana
Building type
Place of worship
Year
2026
Footprint
18 m × 21 m (59 ft × 69 ft), two floors · about 378 m² (4,100 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About Guyana Mosque

World Steel designed the steel structure and sheeting for a two-floor mosque in Georgetown, Guyana. The building sits on an 18 m × 21 m (59 ft × 69 ft) plan with a semi-circular platform at the front, worked out from the proposal drawings (Rev. 01, September 2026) for the first floor, the second floor and the roof.

The floors and roof are framed with welded plate girders whose webs reach 1.5 m (4.9 ft) deep. Each girder was fitted and welded from plate in our plant in Vietnam, its end plates drilled for bolted connections, then painted, bundled, strapped and wrapped for the voyage to Georgetown. The local contractor erects the frame from our erection drawings and piece marks.

A place of worship asks for open rooms, a front that people remember and steel that arrives ready to bolt together. If you are building a mosque, church, temple or community hall, in the Caribbean or in the US, send us the drawings you have and we return a steel scope for your engineer of record to review.

The mosque is World Steel’s first place of worship for Guyana, and it was built like our heavy industrial work: deep plate girders welded from plate, drilled end plates and bundles packed for a long ocean route. The same plant and the same checks serve a congregation’s building and a 5,000 t factory.

In context

Guyana Mosque by the numbers

Footprint

About 378 m² (4,070 sq ft) of footprint, about 7% of a US football field with end zones.

It is 18 m (59 ft) wide. A width under 20 m is usually one clear span, the size of many US shops, storage sheds and small warehouses.

In the portfolio

Guyana Mosque is one of 1 place of worships in the World Steel portfolio on this site, and one of 3 projects listed for Guyana.

World Steel supplied Guyana Mosque in 2026, together with 6 other projects shown here from that year.

Design points

What a place of worship needs from its steel

General points for every place of worship, not specific to this one.

Open rooms for the congregation

A prayer hall or sanctuary works best with few interior columns, so deep girders or trusses carry the floors and roof across the room.

Learn more →

A front people remember

Arches, screens, glazed entrances and towers are framed into the steel from the start, so the architect’s front is built as drawn.

Learn more →

Crowds raise the design loads

Assembly rooms often fall in a higher Risk Category under ASCE 7 because of the number of people, which the engineer of record confirms.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Steel structure and sheeting: main frame, secondary members and sheeting, designed, fabricated and supplied by World Steel. Foundations and erection by the local contractor.
Engineering highlights
Two floors on an 18 m × 21 m (59 ft × 69 ft) plan with a semi-circular platform at the front. Welded plate girders with webs up to 1.5 m (4.9 ft) deep frame the floors and roof.
Fabrication
Plate girders fitted and welded from plate in World Steel’s plant in Vietnam, end plates drilled for bolted site connections, then painted.
Packing
Members bundled by size on timber dunnage, strapped and wrapped for the ocean voyage, with piece marks matching the erection drawings.
Shipping
Shipped by World Steel from Vietnam to Georgetown, Guyana.

Planning a place of worship in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.