Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the GPPD Energy Factory

Aerial photo, World Steel project archive.

Dong Nai Province, Vietnam

GPPD Energy Factory Structural steel for a factory in Vietnam

World Steel's 2020 factory building in Dong Nai Province, Vietnam. An energy-sector plant building, relevant to US contractors working on power, battery and utility projects.

Location
Dong Nai Province, Vietnam
Building type
Factory
Year
2020
Next step Plan a similar building →

Project overview

About GPPD Energy Factory

GPPD Energy Factory is a 2020 industrial building in Dong Nai Province, one of southern Vietnam’s busiest manufacturing regions. World Steel supplied the steel structure, taking it from shop drawings through fabrication to a package sorted for erection on site.

US manufacturers looking at a new production hall can read this project as proof of routine factory work, not a one-off. A comparable American plant would be designed to IBC 2024 and ASCE 7-22 with MBMA practice for the building system, and any roof equipment or future solar array would be set as a design load by your Engineer of Record. Share your equipment layout and we will outline a frame.

An energy company's factory building in Dong Nai Province. Energy-sector owners usually set their own technical specifications on top of the building code, and the steel design and quality records follow them.

In context

GPPD Energy Factory by the numbers

In the portfolio

GPPD Energy Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied GPPD Energy Factory in 2020, together with 26 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.