Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Tuatong Warehouse, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Tuatong Warehouse Structural steel for a warehouse in Thailand

World Steel's 2019 steel warehouse in Thailand. The first of two warehouses World Steel supplied to the same owner, a pattern US owners follow when they grow in phases.

Location
Thailand
Building type
Warehouse
Year
2019
Next step Plan a similar building →

Project overview

About Tuatong Warehouse

Tuatong Warehouse was completed in Thailand in 2019, with World Steel designing, fabricating and supplying its steel structure. A second building, Tuatong 2 Warehouse, appears in the same year on World Steel’s project list, so this job marks the start of a two-building relationship rather than a single transaction.

US owners who expect to grow should choose a steel supplier that can match an existing building later. Because a phase-two building can be detailed from the first building’s Tekla Structures model, proven frame details carry over while the design is rechecked against the code in force, IBC 2024 and ASCE 7-22 by default. Tell us about phase one and your growth plans.

The first Tuatong warehouse was followed by a second, listed separately on this site. A first building that works well is the reason owners come back, and both were supplied in 2019.

In context

Tuatong Warehouse by the numbers

In the portfolio

Tuatong Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Tuatong Warehouse in 2019, together with 19 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.