Dong Thap Province, Vietnam

Tien Giang Tongwei Animal Feed Factory (Expansion) Structural steel for a factory in Vietnam

A factory building in Dong Thap Province, Vietnam, listed in World Steel's portfolio for 2020. It extended an earlier World Steel plant for the same feed producer. An expansion for Tongwei, whose phase 1 took about 1,500 tonnes of World Steel steel. Repeat orders from a large owner are a strong signal for US buyers.

Location
Dong Thap Province, Vietnam
Building type
Factory
Year
2020
Next step Plan a similar building →

Project overview

About Tien Giang Tongwei Animal Feed Factory (Expansion)

The 2020 expansion of the Tien Giang Tongwei Animal Feed Factory in Dong Thap Province added new steel to a plant World Steel had already framed in its first phase in 2018. Coming back to the same supplier for a second phase is the clearest sign that the first package worked for the owner.

Expansion is common in US agriculture and food processing, and it raises its own questions: matching existing column lines, tying into an older roof and keeping production running nearby. We detail new framing in Tekla against the as-built survey you provide, and your Engineer of Record approves how new meets old. Send drawings of your existing building to start.

An expansion has to tie into a building that is already in use. The new frame is matched to the existing column lines and roof levels, and erection is planned so production next door can continue, a common situation for US plant expansions.

Drawn illustration of factory, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Tien Giang Tongwei Animal Feed Factory (Expansion) by the numbers

In the portfolio

Tien Giang Tongwei Animal Feed Factory (Expansion) is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Tien Giang Tongwei Animal Feed Factory (Expansion) in 2020, together with 26 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.