Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the Hai Duong Tongwei Animal Feed Factory

Aerial photo, World Steel project archive.

Hai Phong City, Vietnam

Hai Duong Tongwei Animal Feed Factory Structural steel for a factory in Vietnam

A factory building in Hai Phong City, Vietnam, listed in World Steel's portfolio for 2020. A reference for long-bay industrial buildings where future expansion has to be planned from day one.

Location
Hai Phong City, Vietnam
Building type
Factory
Year
2020
Next step Plan a similar building →

Project overview

About Hai Duong Tongwei Animal Feed Factory

This 2020 project in Hai Phong City, northern Vietnam, is one of several Tongwei animal feed factories in World Steel’s portfolio. Feed manufacturing sites typically combine process buildings, ingredient storage and loading areas, so the steel package has to suit more than one building form on a single campus.

Feed mills and grain handling sites across the Midwest and the South face the same mix of uses. A US version would be engineered to IBC 2024 and ASCE 7-22, with equipment and conveyor loads confirmed by your Engineer of Record, and shipped in containers grouped by building so your erector can work one structure at a time. Tell us about your site plan.

Tongwei is one of the largest feed and aquaculture groups in Asia, and World Steel has supplied several of its plants. A repeat customer of this size is the best reference a fabricator can give US buyers.

In context

Hai Duong Tongwei Animal Feed Factory by the numbers

In the portfolio

Hai Duong Tongwei Animal Feed Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Hai Duong Tongwei Animal Feed Factory in 2020, together with 26 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.