Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the CFG Long An Bridge on site

Site photo, World Steel project archive.

Tay Ninh Province, Vietnam

CFG Long An Bridge 196 t of structural steel for a steel bridge in Vietnam

A steel bridge in Tay Ninh Province, Vietnam, listed in World Steel's portfolio for 2023. World Steel states about 196 tonnes of steel for it. Bridges and walkways need fabrication tolerances well beyond a standard building, so they show workshop precision.

Location
Tay Ninh Province, Vietnam
Building type
Steel bridge
Year
2023
Structural steel
196 t
Next step Plan a similar building → Next step See all projects →

Project overview

About CFG Long An Bridge

CFG Long An Bridge is a steel bridge completed in 2023 and listed in Tay Ninh Province, Vietnam, with about 196 metric tons of steel designed, fabricated and supplied by World Steel. Bridge fabrication in general differs from building work: girders are long and heavy, fit-up tolerances are tight, and pieces must be transported and lifted as large, carefully planned units.

In the US, publicly funded highway bridges follow AASHTO specifications and often federal steel-origin rules, so this reference fits best with private, industrial or site bridges, conveyor crossings and pedestrian links where the owner and Engineer of Record set the design basis. If your project needs heavy fabricated girders, send drawings and we will confirm whether we can supply them.

About 196 tonnes for a steel bridge. Bridge members are heavier than building members and their welds face fatigue loading from traffic, so welding procedures and inspection follow stricter rules than for a typical building.

In context

CFG Long An Bridge by the numbers

Steel weight

About 196 metric tons of structural steel (216 short tons), about 8% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 15th largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

CFG Long An Bridge is one of 3 steel bridges in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied CFG Long An Bridge in 2023, together with 21 other projects shown here from that year.

More steel bridges:

Design points

What a steel bridge needs from its steel

General points for every steel bridge, not specific to this one.

Weld inspection

Bridge welds see repeated live loads, so inspection is more rigorous than for building welds.

Learn more →

Shop fit-up checks

Splices are checked in the factory so the bridge assembles in the field without reaming or rework.

Learn more →

Protection for the crossing

Bridges over streams, rivers or salted roads get galvanizing or a coating system matched to the exposure.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Steel bridge. Steel structure design, fabrication and supply by World Steel.

Planning a steel bridge in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.