Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the 7-ELEVEN, Thailand on site

Site photo, World Steel project archive.

Thailand

7-ELEVEN 791 t of structural steel for a commercial & retail building in Thailand

A commercial building in Thailand (2020). World Steel states about 791 tonnes of steel for it. At about 791 tonnes, it shows that retail and convenience chains with repeat store layouts can source their framing from one plant.

Location
Thailand
Building type
Commercial & retail building
Year
2020
Structural steel
791 t
Next step Plan a similar building → Next step See all projects →

Project overview

About 7-ELEVEN

The 7-ELEVEN project in Thailand used about 791 metric tons of World Steel structural steel in 2020, making it a large commercial and retail reference by any measure. For US retail developers and the contractors who build for them, the figure shows that the factory can take on a sizable program and keep quality consistent across a large volume of members.

Retail work tends to run on standard layouts and tight coordination with tenants, so accurate shop drawings and clean piece marking matter. On a US retail or mixed-use job, World Steel designs to IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis and shares BIM/IFC models with the design team. Send your retail program to discuss supply.

About 791 tonnes for a convenience retail program means a great many similar buildings or one large facility, and either way it rewards standard details. For US retail chains that roll out the same store design in many places, World Steel can keep one approved set of connections and sizes and adjust only for each site's loads.

In context

7-ELEVEN by the numbers

Steel weight

About 791 metric tons of structural steel (872 short tons), about 32% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 6th largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

7-ELEVEN is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied 7-ELEVEN in 2020, together with 26 other projects shown here from that year.

More commercial and retail buildings:

Design points

What a commercial & retail building needs from its steel

General points for every commercial & retail building, not specific to this one.

Flexible floor plans

Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.

Learn more →

Curb appeal

Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.

Learn more →

Snow and roof steps

Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Commercial & retail building. Steel structure design, fabrication and supply by World Steel.

Planning a commercial & retail building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.