- Location
- Tay Ninh Province, Vietnam
- Building type
- Warehouse
- Year
- 2019
Project overview
About Nam Long Warehouse
Nam Long Warehouse in Tay Ninh Province, Vietnam, was supplied by World Steel in 2019. It is a pre-engineered steel warehouse, the building type that makes up most of the company’s export volume.
In the US, pre-engineered warehouses serve farms, distributors, contractors and self-storage operators alike. Tapered rigid frames, cold-formed purlins and girts designed to AISI S100, and bracing laid out to MBMA practice keep steel weight proportional to the span. Your local erector assembles the bolted kit from our drawings. Send your width, length and eave height for a priced proposal.
Nam Long Warehouse in Tay Ninh Province, supplied in 2019, is in the same province as World Steel's plant. US customers who visit the plant can see how a finished pre-engineered warehouse goes together, not only the members in the shop.
Gallery
Nam Long Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Nam Long Warehouse by the numbers
In the portfolio
Nam Long Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Nam Long Warehouse in 2019, together with 19 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Hoc Mon District, Vietnam · 2019
Pacific Warehouse
Warehouse
Ho Chi Minh City, Vietnam · 2019
Cat Lai Warehouse
Warehouse
Photo
Thailand · 2023
JSB Warehouse 55×127
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.