- Location
- Malaysia
- Building type
- Factory
- Year
- 2019
Project overview
About Perumal Steel Mould Factory
Perumal Steel Mould Factory is a 2019 industrial building in Malaysia, where World Steel supplied the steel structure for a mould-making plant. Tooling shops handle heavy workpieces, so floor layout and lifting equipment shape the frame.
US tool and die shops, machine shops and metal fabricators often want overhead cranes. Crane capacity, runway beams and fatigue checks are general design points that must be defined by your Engineer of Record before the frame is designed, never added afterward. We design and detail to those criteria under AISC 360. Send your crane and equipment data for a review.
A factory in Malaysia for a steel mold maker, a business with heavy machine tools and lifting needs. Shops like this usually need crane runways along the bays, designed together with the main frame.
Gallery
Perumal Steel Mould Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Perumal Steel Mould Factory by the numbers
In the portfolio
Perumal Steel Mould Factory is one of 33 factories in the World Steel portfolio on this site, and one of 1 projects listed for Malaysia.
World Steel supplied Perumal Steel Mould Factory in 2019, together with 19 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Tay Ninh Province, Vietnam · 2022
Brotex Yarn Manufacturing Factory
Factory
Photo
Dong Nai Province, Vietnam · 2020
GPPD Energy Factory
Factory
Photo
Thailand · 2020
Interlink Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.