- Location
- Tay Ninh Province, Vietnam
- Building type
- Factory
- Year
- 2018
Project overview
About Anh Phat Factory
World Steel engineered and supplied the steel structure for Anh Phat Factory in Tay Ninh Province, Vietnam, in 2018. It is one of several factory and warehouse projects the company has completed in that province.
Repeated work in one industrial area shows a supplier that builds the same building type many times, which helps US buyers who want predictable detailing. On a US factory we provide calculations for your Engineer of Record’s review, plus erection drawings and anchor bolt layouts. Send your building outline for a scope proposal.
Anh Phat Factory in Tay Ninh Province, supplied in 2018, is in the same province as World Steel's plant. Work this close to home gives the engineering team direct feedback on how their connection details go together on site.
In context
Anh Phat Factory by the numbers
In the portfolio
Anh Phat Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Anh Phat Factory in 2018, together with 5 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Tay Ninh Province, Vietnam · 2022
Brotex Yarn Manufacturing Factory
Factory
Photo
Tay Ninh Province, Vietnam · 2016
World Steel Group Steel Structure Factory
Factory
Photo
Chon Thanh, Dong Nai Province, Vietnam · 2026
New Hope Dong Nai Feed Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.