- Location
- Guam
- Building type
- Multi-storey & civil building
- Structural steel
- 120 t
Project overview
About FPI Barracks
FPI Barracks is a multi-story building in the US territory of Guam, framed with about 120 metric tons of World Steel structural steel. Because Guam follows US building codes, the project went through the kind of design basis and plan review a US owner will recognize. Multi-level steel brings beams, columns, floor framing and lateral bracing into one coordinated set, which is more demanding than a single-story shed.
For a comparable US building, World Steel can model the frame in SAP2000, detail every connection in Tekla Structures and share BIM/IFC files with your architect and Engineer of Record. Hot-rolled and built-up members follow AISC 360, with seismic and wind loads taken from ASCE 7-22 for your site. Send drawings for a multi-story steel package and we will return a scope and quote.
Barracks and dormitories repeat the same room module floor after floor, which suits steel framing with standard beam and column sizes. Repetition lets the shop fabricate many identical members, and it lets the US contractor erect each floor in the same sequence as the one below.
Gallery
FPI Barracks images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
FPI Barracks by the numbers
Steel weight
About 120 metric tons of structural steel (132 short tons), about 5% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 17th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
FPI Barracks is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 3 projects listed for Guam.
Closest in steel weight:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Complete building package by World Steel: structural design with seismic design, structural calculation report, detailed permit drawings, shop drawings, fabrication and CIF delivery to Guam, all within 60 days. Supply: steel structure, floor decking, anchor bolts, roof and wall panels, insulation and finishing trims and accessories.
- Engineering highlights
- Seismic design of the steel structure, with the structural calculation report and permit-level drawings prepared by World Steel engineers. Two-storey steel frame with steel floor decking. Design, calculations, permit drawings, shop drawings, fabrication and CIF delivery completed in 60 days.
- Shipping
- CIF delivery to Guam, 60 days from start of design to delivery.
More projects
Related projects
3D model
United States · 2023
North West Community Center
Multi-storey & civil building
Photo
Tay Ninh Province, Vietnam · 2023
World Steel Group Office, Tay Ninh
Multi-storey & civil building
Photo
Philippines · 2023
3 Storey College of Medicine
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.