- Location
- Tay Ninh Province, Vietnam
- Building type
- Factory
Project overview
About Tay Ninh AA Corporation Factory
Tay Ninh AA Corporation Factory is an industrial building in Tay Ninh Province, Vietnam, with a steel structure engineered and supplied by World Steel. It adds to the company’s cluster of factory projects in that province.
A US manufacturer weighing an imported steel package will want to know who handles what. We engineer, detail and fabricate the steel; your Engineer of Record approves the design; your local contractor builds the foundations and your erector assembles the frame. Each quote names the Incoterm and the importer of record. Send your project basics for a scoped proposal.
AA Corporation is a Vietnamese furniture and interior fit-out group that works for international hotel brands. Its factory handles wood, metal and upholstery, so the building has mixed production areas under one roof.
Gallery
Tay Ninh AA Corporation Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Tay Ninh AA Corporation Factory by the numbers
In the portfolio
Tay Ninh AA Corporation Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Dong Nai Province, Vietnam · 2020
GPPD Energy Factory
Factory
Photo
Quang Ngai Province, Vietnam · 2019
Hoa Phat Factory Project
Factory
Photo
Can Tho City, Vietnam · 2023
Hau Giang Number One Beverage Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.