- Location
- United States
- Building type
- Multi-storey & civil building
- Year
- 2023
- Status
- Completed
Project overview
About North West Community Center
North West Community Center is a 2023 US delivery, a civic building whose structural steel was engineered and fabricated by World Steel. Public and community buildings usually hold more people at once than a warehouse, so they face extra scrutiny on occupancy, exits and structural documentation. Delivering one into the US shows that the paperwork side of the process can keep pace with the steel.
For a community hall, recreation center or similar civic building, World Steel prepares calculations and drawings for your Engineer of Record to review and approve for your local building department. Public owners using federal funds should confirm any domestic steel rules with their contracting officer before ordering. Send your program and drawings for a review.
Community buildings in the US often double as emergency shelters or polling places, which can put them in a higher IBC risk category than their size suggests. That decision belongs to the owner and the Engineer of Record, but it changes wind and seismic loads, so it is the first question World Steel asks before designing a civic frame.
Gallery
North West Community Center images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
North West Community Center by the numbers
In the portfolio
North West Community Center is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 7 projects listed for United States.
World Steel supplied North West Community Center in 2023, together with 21 other projects shown here from that year.
More multi-storey and civil buildings:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Structural design, fabrication and export supply of the steel structure.
More projects
Related projects
3D model
Guam
FPI Barracks
Multi-storey & civil building · 120 t steel
Photo
Vietnam · 2022
Hai Trung Furniture Showroom and Model House Center
Multi-storey & civil building
3D model
Antigua and Barbuda · 2023
Proposed Residential Building
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.