- Location
- Western Australia, Australia
- Building type
- Multi-storey & civil building
- Year
- 2023
- Structural steel
- 60 t
Project overview
About Byford Child Care
Byford Child Care is an early learning building in Western Australia, framed in 2023 with about 60 metric tons of World Steel structural steel. It is a small project by tonnage, but it belongs to a building category that US jurisdictions review with care, since educational and daycare occupancies carry specific requirements for exits, fire protection and structural documentation.
A US daycare center, preschool or small school building can follow a similar approach: a light steel frame designed to IBC 2024 and ASCE 7-22, with calculations and drawings prepared for your Engineer of Record to review and approve for the permit. Share your architect’s plans and we will outline what World Steel would supply.
Small public buildings like this need quality control as strict as large ones, because inspectors check them just as closely. A 60-tonne package goes through the same IAS AC472 inspection program at World Steel's plant as a 5,000-tonne one, which is useful to know if you are building a US school, daycare or clinic.
Gallery
Byford Child Care images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Byford Child Care by the numbers
Steel weight
About 60 metric tons of structural steel (66 short tons), about 2% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 18th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Byford Child Care is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 6 projects listed for Australia.
World Steel supplied Byford Child Care in 2023, together with 21 other projects shown here from that year.
Closest in steel weight:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
3D model
Western Australia, Australia
Whaleback Golf Club
Multi-storey & civil building · 50 t steel
Photo
Kalgoorlie-Boulder, Western Australia, Australia
Goldfields Arts Centre
Multi-storey & civil building · 400 t steel
Photo
Ho Chi Minh City, Vietnam · 2020
Dat Tuan Pharmaceutical Office
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.