Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Malang Warehouse, Indonesia on site

Site photo, World Steel project archive.

Indonesia

Malang Warehouse Structural steel for a warehouse in Indonesia

World Steel's 2024 steel warehouse in Indonesia. A portal frame with no interior columns gives the open forklift floor US distributors look for.

Location
Indonesia
Building type
Warehouse
Year
2024
Next step Plan a similar building →

Project overview

About Malang Warehouse

Malang Warehouse in Indonesia is a 2024 pre-engineered steel building supplied by World Steel. The scope covered the frame and the secondary steel that carries the roof and wall cladding.

Pre-engineered warehouses are popular in the US because the frame is tuned to the loads and the span, which keeps steel weight in check. Snow, wind and seismic loads differ widely between states, so we design to ASCE 7-22 values for your exact site. Your local erector bolts the system together from our erection drawings. Send your site address and size.

Malang is an inland city in East Java, at higher ground with heavy seasonal rain. Rainfall and seismic loads both matter there, and steel shipped from Vietnam crossed the sea in packed lots, as it does to US ports.

In context

Malang Warehouse by the numbers

In the portfolio

Malang Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 3 projects listed for Indonesia.

World Steel supplied Malang Warehouse in 2024, together with 16 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.