- Location
- United States
- Building type
- Steel railing & handrail
- Year
- 2019
- Structural steel
- 150 t
- Status
- Completed
Project overview
About Railing
This 2019 US delivery was not a building at all: World Steel fabricated about 150 metric tons of steel railing and shipped it to the United States. Miscellaneous metals like rails and handrails come in large quantities of similar pieces, and the order shows the factory can handle volume work that has to match field dimensions closely.
For US general contractors and steel erectors, a railing or handrail package can be ordered alongside the main structure or on its own. Each piece is detailed in Tekla Structures, marked to its location and packed in the order crews install it. If your project needs railings, handrails or similar fabricated items, send the drawings and quantities for a quote.
Railings and handrails face tight tolerances and inspection under the IBC guard and handrail rules for height, opening size and load. For a large quantity, repeat pieces are fabricated and checked to one set of dimensions, and the shop drawings show every location so the US contractor can install them in order.
In context
Railing by the numbers
Steel weight
About 150 metric tons of structural steel (165 short tons), about 6% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 16th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Railing is one of 1 railing projects in the World Steel portfolio on this site, and one of 7 projects listed for United States.
World Steel supplied Railing in 2019, together with 19 other projects shown here from that year.
Design points
What a steel railing & handrail needs from its steel
General points for every steel railing & handrail, not specific to this one.
Module-to-module accuracy
Railing modules must line up across long runs, so factory jigs and dimensional checks control every piece.
Learn more →Tagged in install order
Each module carries a piece mark and ships in the order the installer will set it.
Learn more →A hard-wearing finish
Outdoor railings are handled daily, so galvanizing or a durable coating is the default.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Structural design, fabrication and export supply of the steel structure.
More projects
Related projects
United States · 2019
Carport
Open steel structure
Photo
Singapore · 2020
Steel Bridge
Steel bridge
Photo
Thailand · 2020
Winmax Export Project
Port facility
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a steel railing & handrail in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.