- Location
- Thailand
- Building type
- Warehouse
- Year
- 2024
- Footprint
- 23 m × 62 m (75 ft × 203 ft) · about 1,426 m² (15,300 sq ft)
Project overview
About Warehouse 23×62
Warehouse 23×62 is a 2024 project in Thailand with a 23 by 62 m footprint, about 75 by 203 ft or roughly 15,000 sq ft. That size suits many US small-business users, such as a distributor, trade supplier or local manufacturer that needs a single building with an office corner, a few overhead doors and open storage.
World Steel can lay out a building of this size around your operations: door locations, mezzanine or office areas, and an end wall ready for future expansion. The frame is designed to the US basis set by your Engineer of Record, and the package includes erection drawings, piece marks and anchor bolt plans. Send your sketch or site plan and we will scope the steel.
A 23 m by 62 m building gives about 1,430 m² (15,400 sq ft) of floor, a typical size for a regional distributor's warehouse with a small office in one end bay.
Gallery
Warehouse 23×62 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 23×62 by the numbers
Footprint
About 1,426 m² (15,350 sq ft) of footprint, about 27% of a US football field with end zones.
It is 23 m (75 ft) wide. A width of 20 to 35 m can still be one clear span with no interior columns, which US distributors prefer for racking.
By footprint it ranks 18th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 23×62 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 23×62 in 2024, together with 16 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2024
Warehouse 36×114
Warehouse
Photo
Thailand · 2022
CPE Warehouse 80×120
Warehouse
Photo
Thailand
Warehouse 25×80
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.