- Location
- Lam Dong Province, Vietnam
- Building type
- Factory
- Year
- 2020
Project overview
About Nakagawa MFG Vietnam Factory
Nakagawa MFG Vietnam Factory is a 2020 industrial building in Lam Dong Province, in Vietnam’s Central Highlands. World Steel engineered, fabricated and supplied its steel structure, working to the documentation habits manufacturing owners expect.
For a US manufacturer, the useful point is process discipline: analysis in SAP2000, Tekla shop drawings, piece marks on every member and an IAS AC472-accredited factory behind the fabrication. Your local building official still decides inspection requirements, and we supply the calculations and drawings for that review. Share your building size and use to get a scoped proposal.
Nakagawa is a Japanese manufacturer with a plant in Lam Dong, in Vietnam's Central Highlands, where the climate is cooler and wetter than the south. Japanese owners are known for close inspection of the work, a useful test for any fabricator.
In context
Nakagawa MFG Vietnam Factory by the numbers
In the portfolio
Nakagawa MFG Vietnam Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Nakagawa MFG Vietnam Factory in 2020, together with 26 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Dong Nai Province, Vietnam · 2020
GPPD Energy Factory
Factory
Photo
Tay Ninh Province, Vietnam · 2016
World Steel Group Steel Structure Factory
Factory
Photo
Dong Nai Province, Vietnam · 2020
CPV Food Processing Factory
Factory · 2,500 t steel
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.