Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Boss Pharmacere Factory, Thailand on site

Site photo, World Steel project archive.

Thailand

Boss Pharmacere Factory Structural steel for a factory in Thailand

This 2020 project is a factory building in Thailand. Pharmaceutical and personal-care plants need clean, controlled interiors, a reference for US life-science contractors.

Location
Thailand
Building type
Factory
Year
2020
Next step Plan a similar building →

Project overview

About Boss Pharmacere Factory

Boss Pharmacere Factory is an industrial building in Thailand for which World Steel designed, fabricated and supplied steel in 2020. Facilities for pharmaceutical or health products generally need tight coordination between structure and services, because ceilings, ductwork and cleanroom partitions hang from or run through the roof framing. The steel layout therefore shapes how the rest of the building comes together.

US makers of supplements, cosmetics or pharmaceuticals can treat the job as a reference for factory steel coordinated with heavy services. We model the frame in Tekla Structures, share IFC files with your MEP engineers and adjust purlin and beam layouts where your Engineer of Record approves. The code basis defaults to IBC 2024 and ASCE 7-22. Send the process plan for a first review.

Pharmaceutical and personal-care production needs clean rooms with sealed ceilings, which hang from the main steel frame. The frame is designed to carry the ceiling system and the air handling units, as it would in a US life-science plant.

In context

Boss Pharmacere Factory by the numbers

In the portfolio

Boss Pharmacere Factory is one of 33 factories in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Boss Pharmacere Factory in 2020, together with 26 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.