Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the Namyong Warehouse, Thailand on site

Site photo, World Steel project archive.

Thailand

Namyong Warehouse Structural steel for a warehouse in Thailand

A steel warehouse in Thailand, listed in World Steel's portfolio for 2024. Built for a manufacturer to store its own product, the same brief many US plant expansions start with.

Location
Thailand
Building type
Warehouse
Year
2024
Next step Plan a similar building →

Project overview

About Namyong Warehouse

Namyong Warehouse is a 2024 pre-engineered steel warehouse in Thailand supplied by World Steel. Metal building systems of this kind are well known in the US: tapered primary frames, cold-formed secondary members and a bracing scheme designed together, so the structure puts steel where loads demand it and uses less where they do not.

For a US buyer, the key questions are what the package contains and who does what on site. World Steel supplies the engineered steel, connection hardware as specified, anchor bolt plans and erection drawings; your contractor handles foundations, and your erector assembles the frame. Ask for a scope sheet for your own pre-engineered warehouse.

Warehouses built for an industrial owner usually store raw materials and finished goods at different times of the year. The roof and racking are designed for the heaviest season, which is also the right approach for a US plant warehouse.

In context

Namyong Warehouse by the numbers

In the portfolio

Namyong Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Namyong Warehouse in 2024, together with 16 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.