Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the Syncro Engineering, Picton East

Aerial photo, World Steel project archive.

Picton East, Western Australia, Australia

Syncro Engineering Structural steel for a steel building in Australia

Pre-engineered workshop and office buildings for Syncro Engineering at Picton East, Western Australia. World Steel exported the steel in 2022, more than 140 tonnes of it. A workshop with offices under one roof is a common request from US trade, fleet and service businesses.

Location
Picton East, Western Australia, Australia
Building type
Steel building
Year
2022
Next step Plan a similar building →

Project overview

About Syncro Engineering

Syncro Engineering at Picton East, Western Australia, is a 2022 project in which World Steel supplied the steel for a workshop and office facility. Pairing a production space with offices on one site is a very common request from US fabricators, machine shops and service contractors who want staff, equipment and customer meetings in one place.

In a mixed building like this, the workshop frame and the office area often have different heights, loads and finishes, so the steel package has to tie them together cleanly. World Steel coordinates both in one Tekla model, supplies anchor bolt plans and erection drawings, and designs to the basis your Engineer of Record sets. Tell us about your shop and office needs to start a proposal.

A workshop with offices under one roof needs two kinds of structure side by side: a tall, open bay for work and a lower, divided area for people. World Steel designs both in one model, with the office floor or mezzanine tied into the main frame, so the US contractor erects one building, not two.

In context

Syncro Engineering by the numbers

In the portfolio

Syncro Engineering is one of 3 steel buildings in the World Steel portfolio on this site, and one of 6 projects listed for Australia.

World Steel supplied Syncro Engineering in 2022, together with 12 other projects shown here from that year.

More steel buildings:

Design points

What a steel building needs from its steel

General points for every steel building, not specific to this one.

A single designed system

Rigid frames, purlins, girts and panels are designed as one metal building system, so parts fit together when the crew opens the containers.

Learn more →

Built for the next bay

An expandable end wall lets the owner add bays later without rebuilding the original building.

Learn more →

Uplift drives the details

Across much of the US, roof uplift from ASCE 7 wind sets purlin size, fastener spacing and anchor rods.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Steel building. Steel structure design, fabrication and supply by World Steel.

Planning a steel building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.