- Location
- Ca Mau Province, Vietnam
- Building type
- Multi-storey & civil building
- Year
- 2018
Project overview
About Phu Cuong Hotel
Phu Cuong Hotel in Ca Mau Province, at Vietnam’s southern tip, is a 2018 multi-story building framed with World Steel structural steel. Hospitality work brings repeated room bays, stacked floors and the finish coordination that comes with guest-facing space.
For US hotel developers and design-build firms, the point is that a steel frame for a low-rise hotel can be fabricated offshore and delivered as a sequenced package. Design would follow IBC 2024 and AISC 360, with fire protection and floor systems specified by your architect and Engineer of Record. Send your typical floor plan for a framing review.
A hotel in Ca Mau, in Vietnam's far south, close to the sea. Hotels repeat the same guest room layout on each floor, which suits a regular steel grid, and coastal sites call for a coating system chosen for salt air, as on the US Gulf and Atlantic coasts.
In context
Phu Cuong Hotel by the numbers
In the portfolio
Phu Cuong Hotel is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Phu Cuong Hotel in 2018, together with 5 other projects shown here from that year.
More multi-storey and civil buildings:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Ho Chi Minh City, Vietnam · 2020
Southgate Tower
Multi-storey & civil building
Photo
Tay Ninh Province, Vietnam · 2023
World Steel Group Office, Tay Ninh
Multi-storey & civil building
Photo
Vietnam · 2022
Hai Trung Furniture Showroom and Model House Center
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.