- Location
- Hope Valley, Western Australia, Australia
- Building type
- Warehouse
- Structural steel
- 350 t
Project overview
About Hope Valley
Hope Valley is a warehouse in Hope Valley, Western Australia, framed with about 350 metric tons of World Steel structural steel. Tonnage at that level usually reflects a large footprint, tall eaves or heavy loading, the same factors that drive steel weight in a US distribution or logistics facility, which makes it a fair benchmark for a sizable American storage project.
For a US warehouse in this range, World Steel can run alternative frame layouts in SAP2000 and propose value engineering options for your Engineer of Record to approve, then ship the steel as containerized or breakbulk packages sorted by erection sequence. Each quote states the Incoterm and the importer of record. Send your site plan and building size to compare options.
Hope Valley sits in an industrial area south of Perth, where warehouses are built to Australian codes with their own wind regions. For US buyers, the useful point is that World Steel already designs to more than one national code; on your project, the basis is IBC and ASCE 7, or whatever your Engineer of Record sets.
Gallery
Hope Valley images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Hope Valley by the numbers
Steel weight
About 350 metric tons of structural steel (386 short tons), about 14% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 10th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Hope Valley is one of 63 warehouses in the World Steel portfolio on this site, and one of 6 projects listed for Australia.
Closest in steel weight:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Hope Valley, Western Australia, Australia
Mautic Workshop
Warehouse · 60 t steel
Photo
Thailand · 2022
Pegasus Warehouse
Warehouse
Photo
Thailand · 2023
Warehouse 53×120
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.