Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the JSB Warehouse 55×127, Thailand on site

Site photo, World Steel project archive.

Thailand

JSB Warehouse 55×127 Structural steel for a warehouse in Thailand

A steel warehouse in Thailand (2023). The project name gives its plan size as 55 × 127. A warehouse of about 7,000 m², the size of a mid-size US regional distribution building.

Location
Thailand
Building type
Warehouse
Year
2023
Footprint
55 m × 127 m (180 ft × 417 ft) · about 6,985 m² (75,200 sq ft)
Next step Plan a similar building → Next step See all projects →

Project overview

About JSB Warehouse 55×127

This second JSB Warehouse, also finished in 2023 in Thailand, is the larger of the two. Its name gives the plan as 55 × 127 m, roughly 180 ft wide and 417 ft long, enclosing around 75,000 sq ft. A building of this size calls for a steady fabrication flow and careful packaging, since frame lines, bracing and secondary members all multiply as the length grows.

US owners planning distribution, cross-dock or bulk storage space at this scale can read the project as evidence that World Steel handles large-plan warehouses from analysis through shipping. On a US job, widths near 180 ft usually raise the question of clear span versus interior columns; we present both as options for your Engineer of Record to weigh. Share your racking layout and dock count and we will price the frame.

This second JSB building is far larger than the 28 m one, which shows a repeat customer growing with the same supplier. A 55 m (180 ft) width usually calls for a multi-span frame or a deep clear-span rafter, a choice made with the owner and the Engineer of Record.

In context

JSB Warehouse 55×127 by the numbers

Footprint

About 6,985 m² (75,190 sq ft) of footprint, roughly 1.3 times a US football field with end zones.

It is 55 m (180 ft) wide. A width over 55 m is normally framed as a multi-span building, with interior column lines set where the racking or process layout allows.

By footprint it ranks 5th of the 26 warehouses on this site with published dimensions.

In the portfolio

JSB Warehouse 55×127 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied JSB Warehouse 55×127 in 2023, together with 21 other projects shown here from that year.

Closest in footprint:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.