- Location
- Thailand
- Building type
- Warehouse
- Footprint
- 72 m × 74 m (236 ft × 243 ft) · about 5,328 m² (57,400 sq ft)
Project overview
About Warehouse 72×74
Warehouse 72×74 in Thailand has a footprint of 72 by 74 m, about 236 by 243 ft and roughly 57,000 sq ft. With a width over 230 ft, a building like this is framed with interior column lines, giving it more in common with a US manufacturing plant or large agricultural building than with a simple clear-span shed.
Multi-span framing lets the rafters stay lighter, but column placement has to suit the owner’s equipment, aisles and future layout changes. World Steel can propose column grids and value engineering options for your Engineer of Record and then detail the approved frame for fabrication. Share your equipment layout and site address to start a comparable US design.
A 72 m by 74 m building covers about 5,300 m² (57,000 sq ft) in a near-square plan. Square buildings this wide are framed with interior columns, and the roof slope and drainage are planned in both directions.
Gallery
Warehouse 72×74 images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Warehouse 72×74 by the numbers
Footprint
About 5,328 m² (57,350 sq ft) of footprint, close to the area of a US football field with end zones.
It is 72 m (236 ft) wide. A width over 55 m is normally framed as a multi-span building, with interior column lines set where the racking or process layout allows.
By footprint it ranks 10th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 72×74 is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2024
Warehouse 12×24 & Warehouse 12×18
Warehouse
Photo
Thailand · 2024
Namyong Warehouse
Warehouse
Photo
Thailand · 2020
TFIC Warehouse
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.