Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Red multi-story process tower frame next to a feed mill

Process tower frame by World Steel in Vinh Long Province, Vietnam.

Hoc Mon District, Vietnam

Pacific Warehouse Structural steel for a warehouse in Vietnam

A steel warehouse in Hoc Mon District, Vietnam, listed in World Steel's portfolio for 2019. US contractors comparing span and bay options for a speculative warehouse can use it as a sizing benchmark.

Location
Hoc Mon District, Vietnam
Building type
Warehouse
Year
2019
Next step Plan a similar building →

Project overview

About Pacific Warehouse

This 2019 warehouse stands in Hoc Mon District on the northern edge of Ho Chi Minh City. World Steel engineered, fabricated and shipped its pre-engineered steel frame, roof and wall framing as one coordinated package.

For a US buyer comparing metal building suppliers, the relevant point is that the full system comes from one source: primary frames, secondary members, bracing and connection hardware, each piece marked to match the erection drawings. Design follows IBC 2024 and ASCE 7-22 unless your Engineer of Record sets another basis. Ask for a proposal on your own warehouse.

Hoc Mon District, on the northwest edge of Ho Chi Minh City, has many warehouses serving the city. Warehouses on the edge of a big city have the same brief as US last-mile logistics buildings: many doors, short truck turnaround and enough clear height for racking.

Drawn illustration of warehouse, standing in for a photo of this project Illustration
Drawing, not a photograph: a real World Steel photo replaces it once one is cleared for this page.

In context

Pacific Warehouse by the numbers

In the portfolio

Pacific Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Pacific Warehouse in 2019, together with 19 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.