Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Hat Yai Project, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Hat Yai Project Structural steel for a steel building in Thailand

World Steel's 2020 steel building in Thailand. It adds to the spread of building sizes and uses in World Steel's portfolio.

Location
Thailand
Building type
Steel building
Year
2020
Next step Plan a similar building →

Project overview

About Hat Yai Project

The Hat Yai Project is a steel building in Thailand that World Steel completed in 2020, covering structural design, fabrication and supply. It belongs to a busy year in which the company delivered more than a dozen Thai projects across warehouses, factories, retail and port work, a spread that tested its export processes on very different building types.

For a US commercial owner, that breadth matters because few projects fit one template. We engineer each building to its own code basis, IBC 2024 and ASCE 7-22 by default, and package the steel for your erector by sequence. Value-engineering options go to your Engineer of Record for approval. Share drawings or a sketch of your building and we will reply with questions and a scope.

Hat Yai is a trading city in southern Thailand with a hot, wet climate and heavy monsoon rain. Roof drainage drives part of the design there, as it does in Florida and along the Gulf Coast, where rain intensity sets gutter and downspout sizes and the roof is checked for ponding.

In context

Hat Yai Project by the numbers

In the portfolio

Hat Yai Project is one of 3 steel buildings in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Hat Yai Project in 2020, together with 26 other projects shown here from that year.

More steel buildings:

Design points

What a steel building needs from its steel

General points for every steel building, not specific to this one.

A single designed system

Rigid frames, purlins, girts and panels are designed as one metal building system, so parts fit together when the crew opens the containers.

Learn more →

Built for the next bay

An expandable end wall lets the owner add bays later without rebuilding the original building.

Learn more →

Uplift drives the details

Across much of the US, roof uplift from ASCE 7 wind sets purlin size, fastener spacing and anchor rods.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Steel building. Steel structure design, fabrication and supply by World Steel.

Planning a steel building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.