Steel structure of the Hoa Phat Factory Project on site

Site photo, World Steel project archive.

Quang Ngai Province, Vietnam

Hoa Phat Factory Project Structural steel for a factory in Vietnam

A factory building in Quang Ngai Province, Vietnam (2019). Built for one of Vietnam's largest steel groups, it is a heavy-industry reference for US plant owners and their contractors.

Location
Quang Ngai Province, Vietnam
Building type
Factory
Year
2019
Next step Plan a similar building →

Project overview

About Hoa Phat Factory Project

The Hoa Phat Factory Project in Quang Ngai Province, Vietnam, was completed in 2019 with World Steel designing, fabricating and supplying the steel structure. It sits in the industrial part of the portfolio, where buildings typically house production lines and must carry loads from equipment and building services in addition to roof and wall loads.

US manufacturers in metals, building products or heavy assembly can treat this as a sign that World Steel works on industrial plants, not only light storage. Your Engineer of Record defines the crane, equipment and service loads; we analyze them in SAP2000, design to AISC 360 and detail every connection in Tekla Structures. Send load data for an early structural scheme.

Hoa Phat is one of Vietnam's largest steel producers, and its plants include heavy industrial buildings with cranes and high roofs. Building for a steel producer means working for a client that knows steel well and checks the work closely.

In context

Hoa Phat Factory Project by the numbers

In the portfolio

Hoa Phat Factory Project is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.

World Steel supplied Hoa Phat Factory Project in 2019, together with 19 other projects shown here from that year.

More factories:

Design points

What a factory needs from its steel

General points for every factory, not specific to this one.

Process first, frame second

Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.

Learn more →

Mezzanines in the model

Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.

Learn more →

Heat, cold and condensation

Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Factory. Steel structure design, fabrication and supply by World Steel.

Planning a factory in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.