- Location
- United States
- Building type
- Open steel structure
- Year
- 2019
- Status
- Completed
Project overview
About Carport
This carport is a 2019 US delivery: an open steel structure engineered and fabricated by World Steel for covered parking. With few or no walls, an open structure relies on its columns, bracing and base connections to carry roof loads and wind effects, so the design is less forgiving than its simple appearance suggests.
US owners use structures like this for parking, equipment cover, fuel areas and outdoor storage. World Steel can apply the ASCE 7-22 provisions for open structures at your site and give your foundation contractor anchor bolt layouts and column reactions. If you are planning a carport, canopy or shade structure, share the size and location to get started.
Open structures are often underestimated: without walls, wind can push up on the roof as well as sideways, and the columns and footings have to resist it. For a US carport or canopy, World Steel gives the foundation designer column reactions for each load case, so the footing size is based on numbers, not a rule of thumb.
In context
Carport by the numbers
In the portfolio
Carport is one of 1 open steel structures in the World Steel portfolio on this site, and one of 7 projects listed for United States.
World Steel supplied Carport in 2019, together with 19 other projects shown here from that year.
Design points
What an open steel structure needs from its steel
General points for every open steel structure, not specific to this one.
No walls for bracing
Canopies and open sheds resist wind through their columns and anchorage alone, with wind pushing up under the roof.
Learn more →Every connection shown
The load path from roof panel to foundation is detailed on the drawings, connection by connection.
Learn more →Weather on the frame
With no walls, the steel sees rain, snow and road salt directly, so the finish is chosen with care.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Structural design, fabrication and export supply of the steel structure.
More projects
Related projects
United States · 2019
Railing
Steel railing & handrail · 150 t steel
Photo
Tay Ninh Province, Vietnam · 2023
CFG Long An Bridge
Steel bridge · 196 t steel
Photo
Georgetown, Guyana · 2026
Guyana Mosque
Place of worship
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning an open steel structure in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.