- Location
- Thailand
- Building type
- Warehouse
- Year
- 2026
- Footprint
- 45 m × 120 m (148 ft × 394 ft) · about 5,400 m² (58,100 sq ft)
Project overview
About Warehouse 45×120M
Warehouse 45×120M is a 2026 Thai warehouse measuring 45 by 120 m, about 148 by 394 ft or 58,000 sq ft. A width of nearly 150 ft is where US owners face a real choice: a single clear span that leaves the floor open, or interior columns that reduce frame depth and steel weight.
World Steel can model both options in SAP2000 and set out the trade-offs in steel weight, frame depth and floor layout so your Engineer of Record and operations team can decide. Whichever layout is approved, the package arrives detailed in Tekla Structures with erection drawings and piece marks. Send the floor plan and racking layout for your US warehouse to compare options.
A 45 m (148 ft) clear span is wide for a single frame. At that width, rafter depth and frame spacing have a large effect on steel weight, so World Steel usually runs several layouts at the proposal stage before settling on one with the Engineer of Record.
In context
Warehouse 45×120M by the numbers
Footprint
About 5,400 m² (58,130 sq ft) of footprint, close to the area of a US football field with end zones.
It is 45 m (148 ft) wide. At 35 to 55 m wide, a clear span and a frame with one interior column line are both options, and World Steel compares their steel weight at the proposal stage.
By footprint it ranks 9th of the 26 warehouses on this site with published dimensions.
In the portfolio
Warehouse 45×120M is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied Warehouse 45×120M in 2026, together with 6 other projects shown here from that year.
Closest in footprint:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2022
Warehouse 19.4×37
Warehouse
Photo
Thailand · 2020
HDD Warehouse
Warehouse
Photo
Thailand · 2024
Warehouse 36×114
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.