Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Fabricated steel members for the Chumpon Market, Thailand in the fabrication workshop

Photo, World Steel project archive: steel members before shipping.

Thailand

Chumpon Market Structural steel for a commercial & retail building in Thailand

A commercial building in Thailand, listed in World Steel's portfolio for 2020. A reference for owners who want a commercial front without the cost of a concrete frame.

Location
Thailand
Building type
Commercial & retail building
Year
2020
Next step Plan a similar building →

Project overview

About Chumpon Market

Chumpon Market is a commercial building in Thailand completed in 2020, with World Steel providing the steel structure. Public market halls are typically wide, open and busy, with crowds moving between stalls under a single roof. In buildings like this the structure becomes part of the visitor experience, so clean member layouts and tidy connections count as much as the engineering behind them.

Cities, nonprofits and developers in the US planning a public market, food hall or open-air pavilion share those goals. We design to the occupancy and loads that IBC 2024 and ASCE 7-22 assign, coordinate exposed steel with your architect, and supply drawings for permit review by the local building department. Share your concept sketches and we will suggest a framing approach.

A covered market needs a big open roof with as few columns as possible and good natural ventilation, which suits a pre-engineered frame with ridge vents. US farmers markets, covered event spaces and transit canopies share that brief, and they are often built as open or partly open structures under ASCE 7.

In context

Chumpon Market by the numbers

In the portfolio

Chumpon Market is one of 10 commercial and retail buildings in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied Chumpon Market in 2020, together with 26 other projects shown here from that year.

More commercial and retail buildings:

Design points

What a commercial & retail building needs from its steel

General points for every commercial & retail building, not specific to this one.

Flexible floor plans

Stores, dealerships and showrooms change layouts often, so long spans keep interior columns to a minimum.

Learn more →

Curb appeal

Storefront glazing, entry canopies and tidy steel details on the customer side carry as much weight as structural efficiency.

Learn more →

Snow and roof steps

Parapets, canopies and roof height changes collect drifting snow, which ASCE 7 requires the frame to carry.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Commercial & retail building. Steel structure design, fabrication and supply by World Steel.

Planning a commercial & retail building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.