- Location
- Quang Ngai Province, Vietnam
- Building type
- Factory
- Year
- 2020
Project overview
About Millennium Furniture Factory
World Steel supplied the steel structure for the Millennium Furniture Factory in Quang Ngai Province, central Vietnam, in 2020. The plant handles exterior and wooden furniture manufacturing and processing, a use that needs long clear floors for machinery, material flow and finished-goods staging.
Cabinet makers, millwork shops and furniture plants in the US share those needs. Dust collection ducts, overhead lines and possible future crane rails all affect the frame, so they belong in the design brief your Engineer of Record signs off on. We price and detail to that brief under IBC 2024 and MBMA practice. Send your process layout for a first look.
Wood processing plants generate fine dust and need good ventilation and fire protection. The building is designed for long, open bays where timber moves through cutting, finishing and packing lines.
Gallery
Millennium Furniture Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Millennium Furniture Factory by the numbers
In the portfolio
Millennium Furniture Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Millennium Furniture Factory in 2020, together with 26 other projects shown here from that year.
More factories:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Tay Ninh Province, Vietnam · 2022
Brotex Yarn Manufacturing Factory
Factory
Photo
Dong Nai Province, Vietnam · 2020
CPV Food Processing Factory
Factory · 2,500 t steel
Photo
Dong Nai Province, Vietnam · 2020
GPPD Energy Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.