- Location
- Thailand
- Building type
- Warehouse
- Year
- 2020
Project overview
About ASEAN Warehouse
World Steel provided steel design, fabrication and supply for ASEAN Warehouse in Thailand, finished in 2020. Exported warehouse steel in general has to be fabricated with shipping in mind: members sized to fit containers or breakbulk holds, bundles labeled for the site, and bolted connections that let a local crew assemble the frame with as little field welding as possible.
A US contractor buying steel from overseas faces the same logistics. We ship in containerized or breakbulk packages sorted by erection sequence, and each quote states the Incoterm and who acts as importer of record, since imported steel can carry US duties. Engineering follows IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis. Ask for a sample erection drawing set.
A warehouse with a regional trade name, built when World Steel was shipping across Southeast Asia. Exporting to many neighboring countries built the packing and documentation habits that US shipments now rely on.
Gallery
ASEAN Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
ASEAN Warehouse by the numbers
In the portfolio
ASEAN Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied ASEAN Warehouse in 2020, together with 26 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2020
HDD Warehouse
Warehouse
Photo
Thailand · 2024
Siam Lubric Warehouse
Warehouse
Photo
Thailand · 2019
Tuatong 2 Warehouse
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.