Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Aerial view of the Goldfields Arts Centre, Kalgoorlie-Boulder

Aerial photo, World Steel project archive.

Kalgoorlie-Boulder, Western Australia, Australia

Goldfields Arts Centre 400 t of structural steel for a multi-storey & civil building in Australia

A curved-roof arts centre in Kalgoorlie-Boulder, Western Australia, with about 400 tonnes of World Steel structural steel. The curved roof shows fabrication well beyond a straight portal frame, the kind of architectural steel a US performing-arts or civic center package calls for.

Location
Kalgoorlie-Boulder, Western Australia, Australia
Building type
Multi-storey & civil building
Structural steel
400 t
Next step Plan a similar building →

Project overview

About Goldfields Arts Centre

Goldfields Arts Centre in Kalgoorlie-Boulder, Western Australia, was framed with about 400 metric tons of World Steel structural steel. For a US owner, the relevance is the mix of tonnage and building type: a cultural venue at this scale typically needs large column-free rooms, heavy roof framing and careful coordination with architectural finishes, well beyond a standard metal building.

If you are developing a performing arts center, museum, library or similar civic building in the US, World Steel can take the structural drawings from your Engineer of Record, detail connections in Tekla Structures and fabricate the members to AISC 360. Erection drawings and labeled bundles let your erector work through a complex frame in order. Send your drawings to discuss scope.

Curved roof members are rolled or built up to a radius in the shop, and every curve must match the next within tight tolerances so the roof sheeting sits flat. For a US performing arts center, museum or church with a curved roof, the same shop process applies, and the radius and member sizes are confirmed with your architect early.

In context

Goldfields Arts Centre by the numbers

Steel weight

About 400 metric tons of structural steel (441 short tons), about 16% of one month of the plant's 2,500 t monthly fabrication capacity.

It is the 8th largest of the 20 projects on this site with a published steel tonnage.

In the portfolio

Goldfields Arts Centre is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 6 projects listed for Australia.

Closest in steel weight:

Design points

What a multi-storey & civil building needs from its steel

General points for every multi-storey & civil building, not specific to this one.

Stacked tolerances

Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.

Learn more →

Risk category matters

Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.

Learn more →

Fire-resistance ratings

Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.

Planning a multi-storey & civil building in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.