- Location
- Thailand
- Building type
- Warehouse
- Year
- 2020
Project overview
About TFIC Warehouse
World Steel engineered, fabricated and supplied the steel structure for TFIC Warehouse in Thailand, completed in 2020. A storage building like this looks simple from the road, yet the quality of any such frame depends on details few people notice: straight purlin lines, accurate bolt holes and anchor bolt layouts that match the foundation drawings exactly.
US contractors know that misfit steel costs days on site. Our drawings come from one Tekla Structures model, so anchor bolt plans, shop drawings and erection drawings share a single source. The frame is designed to AISC 360 and AISI S100 under the basis your Engineer of Record sets. Send your footprint and eave height and we will return a preliminary scheme.
TFIC is a Thai company, and the warehouse was supplied in 2020, a year when World Steel shipped many projects across Thailand. For US buyers, it is one of a large group of similar buildings that show consistent output rather than a single showcase.
Gallery
TFIC Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
TFIC Warehouse by the numbers
In the portfolio
TFIC Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.
World Steel supplied TFIC Warehouse in 2020, together with 26 other projects shown here from that year.
More warehouses:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Thailand · 2022
Mongkolphisan Warehouse 80×70
Warehouse
Photo
Thailand · 2024
Siam Lubric Warehouse
Warehouse
Photo
Thailand · 2023
SMC3 Warehouse
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.