Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Steel structure of the AMW Warehouse, Thailand on site

Site photo, World Steel project archive.

Thailand

AMW Warehouse Structural steel for a warehouse in Thailand

A steel warehouse in Thailand (2020). A plain, efficient storage frame, the kind of steel package where US contractors compare suppliers on tonnage and detailing quality.

Location
Thailand
Building type
Warehouse
Year
2020
Next step Plan a similar building →

Project overview

About AMW Warehouse

AMW Warehouse was completed in Thailand in 2020, with World Steel handling the steel structure from design through fabrication and supply. It is one of a group of Thai warehouses the company delivered that year, a run of work that kept the same engineering and fabrication teams focused on storage buildings back to back and refined how those packages are prepared.

Why should a US owner care? Repetition builds discipline: standard details, checked shop drawings and shipping lists that match what the erector unloads. For your warehouse we bring that discipline to a US code basis, with AISC 360 and AISI S100 for the steel and MBMA practice for the building system, and drawings ready for your building department. Start by telling us size, location and use.

AMW supplied in 2020 is one of many Thai warehouses on this site. Each one went through the same steps: design, shop drawings, fabrication, inspection and packing by erection sequence, the same workflow US orders follow.

In context

AMW Warehouse by the numbers

In the portfolio

AMW Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 56 projects listed for Thailand.

World Steel supplied AMW Warehouse in 2020, together with 26 other projects shown here from that year.

More warehouses:

Design points

What a warehouse needs from its steel

General points for every warehouse, not specific to this one.

Cube, not just floor area

A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.

Learn more →

Dock doors and bracing

A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.

Learn more →

Snow, rain and ponding

Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.

Learn more →

How we work

How World Steel delivers a building like this

  1. Design process
  2. Wind, snow & seismic design
  3. Quality control
  4. Packing & shipping
  5. Project management
  6. PEB Studio tracking

Project record

Scope of supply
Warehouse. Steel structure design, fabrication and supply by World Steel.

Planning a warehouse in the United States?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.