- Location
- Antigua and Barbuda
- Building type
- Multi-storey & civil building
- Year
- 2023
- Status
- Proposed
Project overview
About Proposed Residential Building
This 2023 proposal is a multi-story residential building in Antigua and Barbuda, designed by World Steel in structural steel. A Caribbean island setting puts hurricane wind and salt exposure at the center of the design discussion.
Developers of apartments and condominiums along the US Gulf Coast, Florida and the Southeast face similar conditions. Wind design under ASCE 7-22 and the corrosion protection your Engineer of Record specifies are general design points for any coastal steel frame. We model the frame, propose options for approval and ship it sequenced floor by floor. Share your residential plans for an early review.
Residential steel framing in a hurricane zone has to resist uplift at every roof connection and keep the building enclosed when winds hit. In the US, that is the world of Florida Building Code high-velocity zones and Gulf Coast wind-borne debris regions, where the design basis is set with the Engineer of Record.
This is a proposed project. Images show the design stage and the building may differ from what is finally built.
Gallery
Proposed Residential Building images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Proposed Residential Building by the numbers
In the portfolio
Proposed Residential Building is one of 18 multi-storey and civil buildings in the World Steel portfolio on this site, and one of 1 projects listed for Antigua and Barbuda.
World Steel supplied Proposed Residential Building in 2023, together with 21 other projects shown here from that year.
More multi-storey and civil buildings:
Design points
What a multi-storey & civil building needs from its steel
General points for every multi-storey & civil building, not specific to this one.
Stacked tolerances
Multi-story framing combines beams, columns and composite deck, and plumbness has to hold level after level.
Learn more →Risk category matters
Schools, clinics and assembly buildings often fall in Risk Category III or IV under the IBC, which raises wind and seismic demands.
Learn more →Fire-resistance ratings
Where the IBC construction type calls for rated steel, the fireproofing method is planned with the architect early on.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Multi-storey & civil building. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
3D model
Western Australia, Australia
Whaleback Golf Club
Multi-storey & civil building · 50 t steel
Photo
Philippines · 2023
Proposed 3 Storey Commercial Building
Multi-storey & civil building
Photo
Ho Chi Minh City, Vietnam · 2020
Southgate Tower
Multi-storey & civil building
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a multi-storey & civil building in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.