- Location
- Indonesia
- Building type
- Warehouse
- Year
- 2025
- Structural steel
- 652 t
Project overview
About Sapphire 2 Warehouse
Sapphire 2 Warehouse in Indonesia used 652 metric tons of World Steel structural steel and was completed in 2025. That is a large single building order, the size associated with a regional distribution or bulk storage facility.
US developers planning a big-box warehouse need a supplier that can fabricate, mark and ship hundreds of tons without losing track of a single piece. We organize packages by erection sequence, list every piece mark on the shipping documents and coordinate the model in Tekla so your erector works from one source. Send your footprint and clear height for pricing.
The name suggests a second building in the Sapphire series, with about 652 tonnes of steel. Indonesia is in a high seismic zone, so the frame is designed for earthquakes as well as wind, as warehouses in California or the Pacific Northwest are.
Gallery
Sapphire 2 Warehouse images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Sapphire 2 Warehouse by the numbers
Steel weight
About 652 metric tons of structural steel (719 short tons), about 26% of one month of the plant's 2,500 t monthly fabrication capacity.
It is the 7th largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Sapphire 2 Warehouse is one of 63 warehouses in the World Steel portfolio on this site, and one of 3 projects listed for Indonesia.
World Steel supplied Sapphire 2 Warehouse in 2025, together with 6 other projects shown here from that year.
Closest in steel weight:
Design points
What a warehouse needs from its steel
General points for every warehouse, not specific to this one.
Cube, not just floor area
A warehouse earns its keep in usable cubic feet, so clear height, bay spacing and span are set from the racking and lift-truck plan before the frame is designed.
Learn more →Dock doors and bracing
A long row of dock doors leaves few solid bays, so each opening is framed on its own and the wall bracing is placed where the wall stays closed.
Learn more →Snow, rain and ponding
Low-slope roofs on big footprints are checked under ASCE 7 for snow drift, rain loads and ponding, and the drainage is sized to match.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Indonesia · 2024
Malang Warehouse
Warehouse
Indonesia · 2025
Wika Intinusa Warehouse
Warehouse
Photo
Philippines · 2023
Philippines Warehouse 2023
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.